As part of the 2016-2018 Miscellaneous Sewer Repair Project, and weather permitting, Duce Construction will be doing a manhole adjustment and will close the westbound right turn lane on East Windsor Road at the intersection of Windsor and Boulder Drive starting on Monday, February 20, 2017 at 9:00 a.m. through Friday, March 3, 2017 at 5:00 p.m. Both Windsor Road and Boulder Drive will remain open to through traffic at all times during the project. Traffic control will be in place to guide motorists through the areas where travel is reduced. Right turning movements will be allowed from the outside westbound lane of Windsor Road.
Motorists are encouraged to drive carefully through this and all construction areas. Thank you for your cooperation while this work is in progress.